{"id":9155,"date":"2026-07-24T11:44:54","date_gmt":"2026-07-24T08:44:54","guid":{"rendered":"https:\/\/axinar.com\/blog\/solar-carport-permit-greece"},"modified":"2026-07-24T11:44:54","modified_gmt":"2026-07-24T08:44:54","slug":"solar-carport-permit-greece","status":"publish","type":"post","link":"https:\/\/axinar.com\/fr\/blog\/solar-carport-permit-greece","title":{"rendered":"Autorisation des carports solaires en Gr\u00e8ce : d\u00e9marches, l\u00e9gislation, calendrier"},"content":{"rendered":"<p>L\u2019autorisation du photovolta\u00efque en Gr\u00e8ce a longtemps \u00e9t\u00e9 l\u2019une des parties les plus complexes de l\u2019installation. Pour <strong>carport solaire<\/strong> la situation s\u2019est nettement simplifi\u00e9e ces derni\u00e8res ann\u00e9es, mais il reste des points critiques qui d\u00e9terminent si le projet aboutira en 1 mois ou en 6 mois.<\/p>\n<div style=\"background:rgba(245,166,35,0.12);border-left:4px solid #f5a623;padding:14px 18px;margin:20px 0;border-radius:4px;color:#ffffff;\">\n<strong>Avertissement important :<\/strong> La l\u00e9gislation sur l\u2019autorisation du PV est souvent mise \u00e0 jour. Les informations ci-dessous sont <em>indicatif<\/em>. Pour chaque projet pr\u00e9cis, <strong>v\u00e9rifiez aupr\u00e8s du service d\u2019urbanisme local, de DEDDIE et de la RAAEY<\/strong> les limites actuelles et le processus.\n<\/div>\n<h2>Deux processus parall\u00e8les<\/h2>\n<p>Pour chaque carport solaire, il y a deux volets d\u2019autorisation distincts :<\/p>\n<ol>\n<li><strong>Permis de construire (structurel) :<\/strong> Pour la construction de l\u2019abri : service d\u2019urbanisme ou nouveau code de la construction (NOK)<\/li>\n<li><strong>Raccordement \u00e9lectrique :<\/strong> Pour le raccordement au r\u00e9seau avec DEDDIE + RAAEY (selon la puissance)<\/li>\n<\/ol>\n<h2>1. Permis de construire<\/h2>\n<h3>Carport solaire en \u00ab construction temporaire \u00bb<\/h3>\n<p>Le <strong>Nouveau code de la construction (NOK)<\/strong> pr\u00e9voit la cat\u00e9gorie des constructions temporaires qui ne n\u00e9cessitent pas de permis de construire, \u00e0 condition de respecter certaines limites :<\/p>\n<ul>\n<li>Hauteur de construction (jusqu\u2019\u00e0 3 \u00e0 3,5 m en g\u00e9n\u00e9ral)<\/li>\n<li>Surface (jusqu\u2019\u00e0 40 m\u00b2 en g\u00e9n\u00e9ral pour le r\u00e9sidentiel)<\/li>\n<li>Distance aux limites de parcelle<\/li>\n<li>Emprise au sol (ne doit pas d\u00e9passer le maximum autoris\u00e9)<\/li>\n<\/ul>\n<p>AXINAR pr\u00e9cise dans le dossier technique du carport solaire que <strong>jusqu\u2019\u00e0 40 m\u00b2, un permis de construire n\u2019est g\u00e9n\u00e9ralement pas requis<\/strong>. Cela d\u00e9pend des coefficients de construction de la zone concern\u00e9e, <strong>renseignez-vous aupr\u00e8s du service d\u2019urbanisme<\/strong>.<\/p>\n<h3>Autorisation pour petite installation (AMK)<\/h3>\n<p>Si vous d\u00e9passez les limites mais restez sous un seuil inf\u00e9rieur, il vous faut une <strong>Autorisation pour petites installations<\/strong>, plus simple et plus rapide qu\u2019un permis de construire complet. En g\u00e9n\u00e9ral :<\/p>\n<ul>\n<li>D\u00e9p\u00f4t au service d\u2019urbanisme avec des plans d\u2019architecte ou d\u2019ing\u00e9nieur en g\u00e9nie civil<\/li>\n<li>D\u00e9lai d\u2019autorisation : 15 \u00e0 45 jours<\/li>\n<li>Co\u00fbt d\u2019autorisation : faible (en g\u00e9n\u00e9ral &lt; 500\u20ac)<\/li>\n<\/ul>\n<h3>Permis de construire complet<\/h3>\n<p>Pour les grands carports solaires (locaux commerciaux, parkings industriels), le d\u00e9lai d\u2019autorisation est de 3 \u00e0 6 mois, avec un co\u00fbt et un dossier plus lourds.<\/p>\n<h2>2. Raccordement \u00e9lectrique<\/h2>\n<h3>Autoconsommation avec injection<\/h3>\n<p>L\u2019autoconsommation avec injection permet de raccorder l\u2019installation PV au r\u00e9seau et d\u2019y transf\u00e9rer l\u2019\u00e9nergie produite :<\/p>\n<ul>\n<li><strong>Puissance jusqu\u2019\u00e0 10,8 kVA :<\/strong> Proc\u00e9dure simplifi\u00e9e via DEDDIE (~1 \u00e0 2 mois en g\u00e9n\u00e9ral)<\/li>\n<li><strong>Capacit\u00e9 sup\u00e9rieure :<\/strong> N\u00e9cessite plus de documents, r\u00f4le de la RAAEY<\/li>\n<\/ul>\n<h3>Autoconsommation sans r\u00e9seau (hors r\u00e9seau)<\/h3>\n<p>Si le carport solaire n\u2019est reli\u00e9 qu\u2019\u00e0 une borne de recharge ou \u00e0 un stockage par batteries <strong>sans raccordement au r\u00e9seau<\/strong>, la proc\u00e9dure se simplifie nettement : pas de DEDDIE, seulement l\u2019installation \u00e9lectrique habituelle.<\/p>\n<h2>Calendrier de projet typique<\/h2>\n<table>\n<thead>\n<tr>\n<th>Phase<\/th>\n<th>Temps<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Choix du syst\u00e8me et \u00e9tude statique (gratuit chez AXINAR)<\/td>\n<td>1 \u00e0 2 semaines<\/td>\n<\/tr>\n<tr>\n<td>Permis de construire (si n\u00e9cessaire)<\/td>\n<td>0 \u00e0 45 jours<\/td>\n<\/tr>\n<tr>\n<td>Demande DEDDIE (si raccord\u00e9 au r\u00e9seau)<\/td>\n<td>1 \u00e0 2 mois<\/td>\n<\/tr>\n<tr>\n<td>Construction et installation PV<\/td>\n<td>1 \u00e0 3 semaines<\/td>\n<\/tr>\n<tr>\n<td>Raccordement au r\u00e9seau et activation<\/td>\n<td>2 \u00e0 4 semaines<\/td>\n<\/tr>\n<tr>\n<td><strong>Total (en g\u00e9n\u00e9ral)<\/strong><\/td>\n<td><strong>2 \u00e0 4 mois<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Conseils pratiques pour acc\u00e9l\u00e9rer l\u2019autorisation<\/h2>\n<ul>\n<li><strong>Privil\u00e9gier \u2264 40 m\u00b2 :<\/strong> Si possible, concevez un carport qui ne n\u00e9cessite pas de permis de construire<\/li>\n<li><strong>Bonne \u00e9tude pr\u00e9alable :<\/strong> Une \u00e9tude statique d\u00e9taill\u00e9e et des plans \u00e9lectriques font gagner du temps en cas d\u2019objection<\/li>\n<li><strong>Lancez DEDDIE t\u00f4t :<\/strong> Le raccordement \u00e9lectrique est souvent l\u2019\u00e9tape la plus lente, d\u00e9posez la demande avant le d\u00e9but des travaux<\/li>\n<li><strong>Installateur professionnel :<\/strong> \u00c9lectricien certifi\u00e9 pour l\u2019\u00e9tude \u00e9lectrique, \u00e9vite les retours de dossier<\/li>\n<\/ul>\n<h2>Cadre l\u00e9gislatif indicatif<\/h2>\n<p><em>(V\u00e9rifiez l\u2019\u00e9tat en vigueur \u00e0 chaque instant)<\/em><\/p>\n<ul>\n<li><strong>Loi 4685\/2020 :<\/strong> Modernisation de la l\u00e9gislation environnementale, proc\u00e9dures d\u2019autorisation des ENR<\/li>\n<li><strong>Nouveau code de la construction (NOK) :<\/strong> Constructions temporaires, emprise, coefficients de construction<\/li>\n<li><strong>Loi 4964\/2022 :<\/strong> March\u00e9 de l\u2019\u00e9nergie &amp; autoconsommation avec injection &amp; ENR<\/li>\n<li><strong>Actes r\u00e9glementaires RAAEY :<\/strong> Pour les installations plus grandes<\/li>\n<li><strong>Directives DEDDIE :<\/strong> Pour le raccordement \u00e9lectrique<\/li>\n<\/ul>\n<div style=\"border:1px solid rgba(221,43,28,.28);border-radius:10px;padding:22px;margin:26px 0;background:rgba(255,255,255,.02);\">\n<div style=\"margin-bottom:14px;\">\n<div style=\"font-family:'Barlow Condensed', sans-serif;font-size:1.35rem;font-weight:700;line-height:1.15;margin-bottom:2px;color:#ffffff;\">Carport solaire AXINAR<\/div>\n<div style=\"opacity:.85;font-size:.92rem;color:#ffffff;\">\u00c9tude statique gratuite, pr\u00eate pour l\u2019autorisation<\/div>\n<\/div>\n<div>\n<p style=\"margin:0 0 12px 0;line-height:1.55;color:#ffffff;\">AXINAR fournit la documentation technique compl\u00e8te pour l\u2019autorisation : \u00e9tude statique, plans \u00e9lectriques, d\u00e9clarations de conformit\u00e9 CE.<\/p>\n<ul style=\"margin:0 0 14px 0;padding-left:20px;color:#ffffff;\">\n<li style=\"margin-bottom:6px;\">Acier S420GD, calcul selon Eurocode 1<\/li>\n<li style=\"margin-bottom:6px;\">Panneaux PERC bifaciaux<\/li>\n<li style=\"margin-bottom:6px;\">\u00c9tude statique gratuite pour l\u2019autorisation<\/li>\n<\/ul>\n<p><a href=\"https:\/\/axinar.com\/fr\/structure-panneau-solaire\/carport-solaire\" style=\"display:inline-block !important;background:#dd2b1c !important;color:#ffffff !important;font-family:Barlow Condensed, sans-serif !important;font-size:.9rem !important;font-weight:700 !important;text-transform:uppercase !important;letter-spacing:1.2px !important;padding:10px 22px !important;border-radius:6px !important;text-decoration:none !important;margin-top:10px;\">Voir le produit \u2192<\/a><\/div>\n<\/div>\n<h2>Demander une \u00e9tude statique &amp; Devis<\/h2>\n<p>Envoyez-nous les donn\u00e9es de base de votre projet : surface, type de toiture ou de sol, zone, puissance PV, et nous r\u00e9pondons sous 24 heures avec un syst\u00e8me de montage recommand\u00e9 et <strong>\u00e9tude statique gratuite<\/strong>.<\/p>\n<p><a href=\"https:\/\/axinar.com\/fr\/contact\" style=\"display:inline-block !important;background:#dd2b1c !important;color:#ffffff !important;font-family:Barlow Condensed, sans-serif !important;font-size:1rem !important;font-weight:700 !important;text-transform:uppercase !important;letter-spacing:1.5px !important;padding:12px 28px !important;border-radius:8px !important;text-decoration:none !important;margin-top:8px;\">Demander un devis \u2192<\/a><\/p>\n<hr>\n<p><em>Voir <a href=\"https:\/\/axinar.com\/fr\/blog\/solar-carport-ev-charger\">Carport solaire avec borne de recharge<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>L\u2019autorisation du photovolta\u00efque en Gr\u00e8ce a longtemps \u00e9t\u00e9 l\u2019une des parties les plus complexes de l\u2019installation. Pour carport solaire la [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":4058,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"rank_math_title":"Autorisation de carport solaire en Gr\u00e8ce : guide des d\u00e9marches | AXINAR","rank_math_description":"Le guide complet de l\u2019autorisation des carports solaires : limites sans permis de construire, raccordement DEDDIE, l\u00e9gislation (loi 4685\/2020, NOK), calendrier de pose.","footnotes":""},"categories":[381,167],"tags":[],"class_list":["post-9155","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/posts\/9155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/comments?post=9155"}],"version-history":[{"count":0,"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/posts\/9155\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/media\/4058"}],"wp:attachment":[{"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/media?parent=9155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/categories?post=9155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/axinar.com\/fr\/wp-json\/wp\/v2\/tags?post=9155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}